Skip to main content

MCS SCHOOL CLOSURE

| Foothill Montessori |

Dear MCS Parents,

Thank you all for your ongoing support. We are grateful for all of the offers of help and assistance. The cleaning crew is still here and they are asking that we stay out of their way while they clean, sanitize and move furniture in preparation for the building repairs. We appreciate everyone’s willingness and ask for your continued patience as we determine our needs. If/when we determine that there is a way for parents to assist us we will let you know.

At this time we have been told that it will take possibly up to 8 weeks for the Lower Level to be repaired and able to accommodate the children. We have been most fortunate to secure temporary classroom space for the Lower and Upper Elementary students and the Middle School students at the All Saints Episcopal Church with whom we share a parking lot. Staff are working to clean that space and will spend time this week creating classrooms there. The Magnolias students are being moved to several different classrooms throughout the school. (Arches, Uinta, Wasatch, Oquirrh and Magnolias parents – a more detailed email will be coming separately to outline the details of your child’s temporary classroom.)

We are still unable to fully assess the damage and/or inventory all of the ruined materials and furniture. Unfortunately, this process is much more time consuming and lengthy than we had originally anticipated.

The clean up crew is directing us to carefully sanitize all of the furniture and materials that we want to take from the Lower Level for the students to use during their temporary relocation. Currently our power is coming from a generator. We hope that we will have permanent power by this evening but are unsure. Our boiler (which provides our heat) has been partially covered with water and we are not sure the extent of its damage. Specialists have been working on it since Saturday but had to wait until the motor, etc. had dried out before conducting more extensive testing. The road right in front of our parking lot entrance is torn up and we may have to determine a plan to redirect our school traffic. There are many people working in many capacities both inside and outside the school. At this time we do not feel that it is safe for the students to return to the building. There are too many variables that are still “undetermined.” We look forward to the students returning when we feel that the building is safe for them and when we have more control over who is entering and exiting the building.

SCHOOL WILL BE CLOSED FOR THE REMAINDER OF THE WEEK. We are also working on a plan to determine how we will make up the missed days.

We understand what a huge inconvenience a school closure is and are very sorry to put our families in this position. Some of our staff members who are not needed in the relocation and set up are willing to provide child care to families who are in need. Please contact the office for names and numbers as needed.

With thanks,
MCS Administration